|
Currently no items.
|
|
Currently no items.
|
|
I-37 SB between US-77/Exit 17 and Redbird Ln/Exit 15/Exit 16
Bridge demolition work in San Patricio on I-37 SB between US-77/Exit 17 and Redbird Ln/Exit 15/Exit 16
|
|
South Padre Island Dr (S-P-I-D) Both EB/WB between Ennis Joslin Rd and Airline Rd
Constructing new ramps and resurfacing Main lanes and Frontage Roads. Alternating lanes closed. in Nueces on South Padre Island Dr (S-P-I-D) EB/WB between Ennis Joslin Rd and Airline Rd
|
|
I-37 NB between Redbird Ln/Exit 15/Exit 16 and US-77/Exit 17
Bridge demolition work in Nueces on I-37 NB between Redbird Ln/Exit 15/Exit 16 and US-77/Exit 17
|
|
Brownlee Boulevard Both NB/SB between McKenzie St. and Morgan Avenue
UTILITY WORK, ALTERNATING LANE CLOSURES in Central City on Brownlee Boulevard NB/SB between McKenzie St. and Morgan Avenue
|
|
I-37 NB between Nueces Bay Blvd/Exit 1E and Up River Rd/Exit 2
Road construction. Left lane closed in Nueces on I-37 NB between Nueces Bay Blvd/Exit 1E and Up River Rd/Exit 2
|
|
Bonner Drive EB between Flynn Parkway and Everhart Road
Construction work in South Side on Bonner Drive EB between Flynn Parkway and Everhart Road
|
|
Norton Street WB between Cambridge Drive and Ramsey Street
Road construction. Roadway reduced to one lane in Central City on Norton Street WB between Cambridge Drive and Ramsey Street
|
|
Crosstown Extension NB between FM-2444 and FM-43/Weber Rd
Construction work in Nueces on Crosstown Extension NB between FM-2444 and FM-43/Weber Rd
|
|
Crosstown Extension SB between FM-43/Weber Rd and FM-2444
Construction work in Nueces on Crosstown Extension SB between FM-43/Weber Rd and FM-2444
|
|
Currently no items.
|