|
11 - 22 MPH (major) US 41 SB before 49th St E/Experimental Farm Rd
Current severity is major
so expect average speeds between 11 - 22 MPH
Accident. Left lane blocked in Tampa Bay on US 41 SB before 49th St E/Experimental Farm Rd. Reported by FL511
|
|
56+ MPH (freely) Empire Church Rd Both EB/WB between Mascotte Empire Rd and E Anderson Rd
Current severity is freely
so expect average speeds between 56+ MPH
Closed due to road surface collapse in Orlando on Empire Church Rd EB/WB between Mascotte Empire Rd and E Anderson Rd. Reported by FL 511
|
|
I-4 EB between US 27 (MM 55) and SR-429-TOLL/Exit 60
Current severity is moderate
so expect average speeds between 23 - 40 MPH
Slow traffic in Polk on I-4 EB between US 27 (MM 55) and SR-429-TOLL/Exit 60
|
|
I-275 Both NB/SB between 38th Ave N (Mm25) and 4th St N (Mm32)
Long-term road construction in Pinellas on I-275 NB/SB between 38th Ave N (Mm25) and 4th St N (Mm32). Reported by FDOT Tampa Bay
|
|
N 15th St Both NB/SB between E Palm Ave and Nuccio Pkwy
Road construction. Roadway reduced to one lane in Hillsborough on N 15th St NB/SB between E Palm Ave and Nuccio Pkwy. Reported by FDOT Tampa Bay
|
|
I-275 Both NB/SB before 36th Ave E and near US 19 (Mm5)
Road construction in Palmetto on I-275 NB/SB before 36th Ave E and near US 19 (Mm5). Reported by FDOT
|
|
US 301 (M/H/P) Both NB/SB from Bloomingdale Ave/Progress Blvd to Dr King Jr Blvd
Paving operations in Riverview on US 301 (M/H/P) NB/SB from Bloomingdale Ave/Progress Blvd to Dr King Jr Blvd. Reported by 511 DOT
|
|
Curlew Road (SR 586) EB after Countryside Blvd to past McMullen Booth Rd
Road construction. Right lane closed in Pinellas on Curlew Road (SR 586) EB after Countryside Blvd to past McMullen Booth Rd. Reported by 511 DOT
|
|
Orange Blossom Trail (US-441) Both NB/SB before Old US 441 and Sacred Oak Avenue
Road construction in Orange on Orange Blossom Trail (US-441) NB/SB before Old US 441 and Sacred Oak Avenue. Reported by DOT
|
|
Hwy 17-92 Both NB/SB after CO Hwy 557/Haines Blvd to past Hwy 17/5th St
Long-term road construction in Polk on Hwy 17-92 NB/SB after CO Hwy 557/Haines Blvd to past Hwy 17/5th St. Reported by DOT
|
|
Adamo Drive (SR-60) Both EB/WB from US-301 to 50th Street
Paving operations in Hillsborough on Adamo Drive (SR-60) EB/WB from US-301 to 50th Street. Reported by 511 DOT
|
|
I-4 WB between Martin Luther King Jr Blvd (Mm 5) and 50th Street (Mm3)
Long-term road construction in Hillsborough on I-4 WB between Martin Luther King Jr Blvd (Mm 5) and 50th Street (Mm3). Reported by FDOT Tampa Bay
|
|
US 301 (M/H/P) Both NB/SB at Gibsonton Dr / Boyette Rd
Paving operations in Riverview on US 301 (M/H/P) NB/SB at Gibsonton Dr / Boyette Rd. Reported by FDOT Tampa Bay
|
|
Currently no items.
|