|
23 - 40 MPH (moderate) I-275 SB at Dr King Blvd (46B)
Current severity is moderate
so expect average speeds between 23 - 40 MPH
Accident. Left Shoulder blocked. in Hillsborough on I-275 SB at Dr King Blvd (46B)
|
|
Currently no items.
|
|
Hwy 17-92 Both NB/SB after CO Hwy 557/Haines Blvd to past Hwy 17/5th St
Long-term road construction in Polk on Hwy 17-92 NB/SB after CO Hwy 557/Haines Blvd to past Hwy 17/5th St. Reported by DOT
|
|
I-275 SB off-ramp to 54th Ave N (Mm26)
Off-ramp closed in Pinellas on I-275 SB off-ramp to 54th Ave N (Mm26). Reported by FDOT Tampa Bay
|
|
US 301 (M/H/P) Both NB/SB from Bloomingdale Ave/Progress Blvd to Dr King Jr Blvd
Paving operations in Riverview on US 301 (M/H/P) NB/SB from Bloomingdale Ave/Progress Blvd to Dr King Jr Blvd. Reported by 511 DOT
|
|
I-275 Both NB/SB before 36th Ave E and near US 19 (Mm5)
Road construction in Palmetto on I-275 NB/SB before 36th Ave E and near US 19 (Mm5). Reported by FDOT
|
|
US 19 Both NB/SB between SR-580 and County Road 95
Long-term road construction in Pinellas on US 19 NB/SB between SR-580 and County Road 95. Reported by FDOT Tampa Bay
|
|
I-4 WB to NB & SB I-275
Long-term road construction in Hillsborough on I-4 WB to NB & SB I-275. Reported by FDOT Tampa Bay
|
|
I-275 SB to EB I-4
Long-term road construction in Tampa on I-275 SB to EB I-4. Reported by FDOT Tampa Bay
|
|
Trilby Rd/Burwell Rd (CR 575) Both NB/SB between Breeden Rd. and US 301
Closed due to road construction in Trilcoochee on Trilby Rd/Burwell Rd (CR 575) NB/SB between Breeden Rd. and US 301. Reported by FDOT Tampa Bay
|
|
54th Ave North WB on-ramp from SB I-275
On-ramp closed in St Petersburg on 54th Ave North WB on-ramp from SB I-275. Reported by FDOT Tampa Bay
|
|
I-275 Both NB/SB between 38th Ave N (Mm25) and 4th St N (Mm32)
Long-term road construction in Pinellas on I-275 NB/SB between 38th Ave N (Mm25) and 4th St N (Mm32). Reported by FDOT Tampa Bay
|
|
Curlew Road (SR 586) EB after Countryside Blvd to past McMullen Booth Rd
Road construction. Right lane closed in Pinellas on Curlew Road (SR 586) EB after Countryside Blvd to past McMullen Booth Rd. Reported by 511 DOT
|
|
I-75 at SR-52 (Mm285)
Interchange Improvements in Pasco on I-75 at SR-52 (Mm285). Reported by FDOT Tampa Bay
|
|
Broadway Avenue Both EB/WB under US 301
Closed due to paving operations in Tampa on Broadway Avenue EB/WB under US 301. Reported by FDOT Tampa Bay
|
|
I-275 Both NB/SB at Jefferson St (45A)
Construction work in Hillsborough on I-275 NB/SB at Jefferson St (45A). Reported by 511 DOT
|
|
N 15th St Both NB/SB between E Palm Ave and Nuccio Pkwy
Road construction. Roadway reduced to one lane in Hillsborough on N 15th St NB/SB between E Palm Ave and Nuccio Pkwy. Reported by FDOT Tampa Bay
|
|
Currently no items.
|