Currently no items.
Currently no items.
Orange Blossom Trail (US-441) Both NB/SB before Old US 441 and Sacred Oak Avenue
Road construction in Orange on Orange Blossom Trail (US-441) NB/SB before Old US 441 and Sacred Oak Avenue. Reported by DOT
US 301 (M/H/P) Both NB/SB from Bloomingdale Ave/Progress Blvd to Dr King Jr Blvd
Paving operations in Riverview on US 301 (M/H/P) NB/SB from Bloomingdale Ave/Progress Blvd to Dr King Jr Blvd. Reported by 511 DOT
US 301 (M/H/P) Both NB/SB at Gibsonton Dr / Boyette Rd
Paving operations in Riverview on US 301 (M/H/P) NB/SB at Gibsonton Dr / Boyette Rd. Reported by FDOT Tampa Bay
I-4 WB between Martin Luther King Jr Blvd (Mm 5) and 50th Street (Mm3)
Long-term road construction in Hillsborough on I-4 WB between Martin Luther King Jr Blvd (Mm 5) and 50th Street (Mm3). Reported by FDOT Tampa Bay
Adamo Drive (SR-60) Both EB/WB from US-301 to 50th Street
Paving operations in Hillsborough on Adamo Drive (SR-60) EB/WB from US-301 to 50th Street. Reported by 511 DOT
I-275 Both NB/SB between 38th Ave N (Mm25) and 4th St N (Mm32)
Long-term road construction in Pinellas on I-275 NB/SB between 38th Ave N (Mm25) and 4th St N (Mm32). Reported by FDOT Tampa Bay
N 15th St Both NB/SB between E Palm Ave and Nuccio Pkwy
Road construction. Roadway reduced to one lane in Hillsborough on N 15th St NB/SB between E Palm Ave and Nuccio Pkwy. Reported by FDOT Tampa Bay
I-275 Both NB/SB before 36th Ave E and near US 19 (Mm5)
Road construction in Palmetto on I-275 NB/SB before 36th Ave E and near US 19 (Mm5). Reported by FDOT
Symmes Rd WB west of US-301 and before US-41/SR-45
Closed due to re-paving and drainage work. in Tampa Bay on Symmes Rd WB west of US-301 and before US-41/SR-45. Reported by 511 DOT
Hwy 17-92 Both NB/SB after CO Hwy 557/Haines Blvd to past Hwy 17/5th St
Long-term road construction in Polk on Hwy 17-92 NB/SB after CO Hwy 557/Haines Blvd to past Hwy 17/5th St. Reported by DOT
Currently no items.